Sc200-200 Construction Hoist/Elevator for Building Construction in Philipines

 
 
单价 24.00 / set对比
销量 暂无
浏览 269
发货 Chinaliaoninganshan
库存 360set
过期 长期有效
更新 2020-07-30 05:47
 
联系方式
加关注0

Jinan Elite International Trade Co., Ltd.

企业会员第4年
资料未认证
保证金未缴纳
详细说明
Product Name: Sc200-200 Construction Hoist/Elevator for Building Construction in Philipines Model NO.: ETS2000 Elevator Door: Sider Door Deceleration Device: With Deceleration Device Attendant: Without Attendant Lift Mechanism: Gear Rack Lift Drive / Actuation: Electric Motor Sling Type: Wire Rope Usage: Construction Hoist Speed: 40M/Min - 60M/Min Load Capacity: 1T - 2T Type: Stationary Cage Size: 3m*1.5m*2.4m(L*W*H) Mast Section Size: 0.65*0.65*1.5m(L*W*H) Safety Device: Saj40-1.2(Sribs) Control Type: Frequency Converter Normal Speed: 0-40m/Min Inverter: 45kw Wall Tie: 3.2-4m Cable: 3*16+2*6mm2 Capacity: 2ton/18 Person Color: Red/Blue/Yellow Mast Section Weight: 160kgs Cage Weight: 1500kgs Driven Motor: 3*11kw or 2*13kw Freestanding Height: 60m Max Lifting Height: 150m Trademark: ET Transport Package: Standard Export Package Specification: Q345B Origin: China HS Code: 843131 Product Description we could supply custom construction hoist, such as the cage, normal size is 3m*1.5m*2.4m(L*W*H)it also could be 2m*1.3m*2m(L*W*H), others also could be available.For the mast section of the construction hoist, it normally is 650mm*650mm*1508mm, others such as450mm*450mm*1508mm, 800*800*1508mm also could be available.The construction speed is divided into three scope: 1. Low speed 36m/min 2. Medium speed: 40-60m/min3. High speed: 60-90m/min.Please tell us below parameters if you inquiry:1. capacity in tons or kgs? 2. single or double cage? 3. Speed required in m/min? 4. otherspecial space limited.Definition: Construction lift is a kind of machine that uses gear rack-pinion transmission method orwire rope lifting method to make the cage move vertically or obliquely to transport people and materials.Usage: Its ideal equipment widely used in construction and other fields, such as industrial, civilconstruction, bridge construction, underground construction, large chimney construction and otherplaces to transport materials and personnel, as a permanent or semi-permanent construction lift canalso be used in warehouses and High towers and other occasions.Our company SC series construction elevators are divided into three drives and two drives per thetransmission mode; also general line frequency control, PLC programmable control and frequencyconversion control (line frequency/frequency conversion control) per the control mode. The generalline frequency running speed is 33m/min; the variable frequency running speed is divided into 0-40m/min, 0-54m/min, 0-63m/min, 0-75m/min, 0-120m/min.The cross section dimensions of the hoist guide rail(mast section) are: 450×450mm, 650×650mm,650×900mm, 800×800mm, and the height is all 1508mm;The construction hoist cage dimensions are: 1.8m×1.35m×2.2m, 3m×1.5m×2.4m,3.2m×1.5m×2.4m,3.2m×1.7m×2.4m,4.5m×1.6m×2.6mSC series construction hoist gear rack-and-pinion transmission adopts advanced technology fromhome and abroad. After years of introduction, absorption and re-innovation, the design is novel, thestructure is reasonable, the operation is simple, the assembly and disassembly is convenient, theappearance is beautiful, and the work is safe and reliable.The main structural parts of mast section are made of Q345B material, and the structural parts areadopt mixed gas protection welding technology. The weld seams are beautiful in appearance andquality, and improve the service life of the equipment. Each part is shot blasting and then sprayed;the mast section can be hot galvanized for good corrosion resistance. At the same time, it has goodlow temperature resistance and reaches minus 40 °C.For the transmission mechanism, gears, back rollers, rollers and other components that affect thesmooth running of the whole machine, further improve the processing and manufacturing precision,improve comfort, stability, safety and reliability, and reduce the maintenance times.Main electrical components are Schneider brand and the products are subject to strict technicaltesting and machine testing to ensure the high quality of the products before leave factory.Smooth operation, no impact, and comfortable ride Adjustable speed, start and stop using lowspeed, normal operation adopt high speed, improve work efficiency.Rapid lifting could meet the requirements of construction efficiency for high-rise buildings .The starting current is less than the rated working current, and the requirements for the powersupply equipment are lower.When starting, the gear and the rack drive have small impact, which effectively reduces the wear ofthe moving parts. When the motor brakes, the inverter and the motor brake work in coordination.When brakes at the low speed of the motor, the brake disc wear is greatly reduced, and the servicelife of it is prolonged. Reduce the maintenance times.The working current with full load rising is basically the same as that of the general hoist. Theworking current is small when the no-load or light load rises and falls, and the energy-saving andenvironmental protection effect is remarkable, which can save more than 30% of energy.The hard tooth surface reducer structure compact, high transmission efficiency, largebearing capacity and long service life.ModelRated capacity kgLifting speed m/minMax lifting height mMotorkwType of ReducerSC200/2002×2000332002×3×11worm gearSC200/2002×2000332002×3×8.5geardriveSC200/2002×2000331502×2×13geardriveSC320/3202×32000-403002×2×13helical gear + bevel gearSC200/2002×20000-543002×2×20helical gear + bevel gearSC200/2002×20000-633002×3×15helical gear + bevel gearSC200/2002×20000-753002×3×20helical gear + bevel gearSC200/2002×20000-1203002×3×20helical gear + bevel gearStructure of the constrution hoist:EnclosureThe enclosure is processed by cold plate punching, whichhas strong corrosion resistance and beautiful appearance.•The enclosure door frame adopts advanced structure, and the dooredge is rigid and not easy to be deformed, ensuring smooth openingof the door, and convenient installation, transportation and storage.Lifting Cage:The main force-receiving parts of the cage are made of Q345B cold-formed steel, which has highstrength and beautiful appearance.The cage top guardrail is made by bending machine. The surface treatment of guardrail,cage door and enclosure door frame adopts pickling-phosphating process and sprayprocessing, which is beautiful and durable.External Electric Control BoxTrunking protectionEnlarge the size of the connection bolt of the cage load bearing roller seat compare withother factory,Improve the local structure, running more stable of the cage.Main AccessoriesThree drive transmission mechanismTwo drive helical gear-bevel type frequency transmission mechanism(0~54m/min)2×20kWOur products have perfect and reliable electrical and mechanicalinterlocking safety devices: door safety switch, broken ropeprotection switch, upper and lower limit switch, limit switch andother electromechanical interlock switches, integral forging typesafety protection hook, safety device, counterweight Double ropetype and bottom buffer.The upper and lower limit travel switch adopts the French Schneider brand, withgood reliability and high repeatability.The overload protector adopts Jiangxi Feida. When the weight in the cage reachesor exceeds its set value, the corresponding relays in the limiter operate separatelyand are connected with the elevator control system to make the elevator operatesafely and reliably.Electric Control SystemCage Top Frequency Control Boxelevator adopts PLC programmable control system, which has a delay control function,which reduces the start and stop impacts, runs smoothly, and has a fault self-diagnosisfunction, which is convenient for maintenance.The main electrical components of the cage top frequency control box adopt Schneiderbrand. The products are subject to strict technical testing and complete machine test toensure the high quality of the products.Another domestic economical frequency converter is available for customers to choose ,which is also safe and reliable.The external brake unit of the traditional frequency conversion elevator has no shortcircuit protection, and the built-in braking unit of the special construction hoist has thefunction of resistance short circuit protection. Compared with the general frequencyconversion electric control cabinet, it is small in size, elegant in appearance, andembedded in the cage. Dedicated logic brake timing control ensures safety and reliabilityby simultaneously starting frequency and current to open the gate. When jog operationfrequently, it has zero dead zone compensation function, no vibration and fallingphenomenon.Welcome your inquiry us!!!
举报收藏 0
更多>本企业其它产品
Made-in-China Express Blow Floating Molds Fence  Road Barrier Mould/Mold for Blow Molding/Making Machine HDPE/PE Extrusion Plastic 1000L 2000L 3000L 5000L 10000L 20000L Water Storage Tank Drum Blow Molding Water Storage Tank Blow Mould CNC Machining Steel Cost Performance for Blow Molding Machine New Design Water Storage Tank Mould Steel Mold CNC Grave Machining Cost Performance Large Capacity Water Container Blow Mould Steel Cost Performance CNC Machining Best Sell Topkit/Hammerhead 5210 35m Freestanding Height Tower Crane for Chile  India Single Oil Case Roots Blower for Fishiery  Pheumatic
网站首页  |  关于我们  |  联系方式  |  用户协议  |  隐私政策  |  版权声明  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报