Supplier
Buyer
Help
Apps
Rules

Gaogong Group Deacidification / Activated Carbon Tower / Dust Collector Hospital Medical Waste Incin

 
 
单价 $4.00 / Piece对比
销量 暂无
浏览 224
发货 Chinashandongzibo
库存 40Piece
过期 长期有效
更新 2020-09-03 09:54
 
联系方式
加关注0

Shandong Gaogong Enviro-Tech Co., Ltd.

Unverified第7年
资料未认证
保证金未缴纳
详细说明
Product Name: Gaogong Group Deacidification / Activated Carbon Tower / Dust Collector Hospital Medical Waste Incinerator Model NO.: GET Treatment: Burning Screw: Multi-Screw Automation: Automatic Certification: ISO, CE Condition: New Other Name: Waste Incinerator Trademark: GAOGONG Transport Package: Standard Export Packing Specification: Depend on Model Origin: Shandong China HS Code: 8417805000 Product Description Different design of Waste Incinerator (Dtry and Wet type )Fuel Type : Diesel & GasStandard : GB18484-2001 Capacity : 20-800 KG / Hour Service Life : 15-20 YearsNumber of chamber: 2 Primary combustion chamber temperature: 500-800 ºC 1Secondary combustion chambertemperature:850-1300(ºC) Incineration efficiency: > 99.9 %Burning Time: 1 hour / BatchGas Purification:Model GET -- 2 Combustion chambers + Purification room + ChimneyModel GEW --2 Combustion chambers + 2 Water Scrubbers + Cyclone Dust Collector + ChimneyProduct Usage: Hospital waste , household waste, poultry farm ,animal petcremationEco friendly: Smokeless and odorless, dioxin freeIncinerators with Ashtray , specially designed for Animal CremationMain Features of GET Waste Incinerator1.Two combustion chambers design Incineration rate more than 99.9% .2.Smokeless and odorless .Secondary combustion chamber can burn down thesmokes , and with purification room to remove sulfide.3.Dioxin-free With working temperature 850-1300 ºC, dioxin all will be destroyed in secondary combustion chamber4.Easy to install and operate Mature design make sure you can operate without staff trainingMain SpecificationModelItemGET-30GET-50GET-100GET-150GET-300GET-500Capacity<30kg/ BatchMax 180kg/ 8 hour30-50 kg/ BatchMax 300kg/8 hour50-100 kg/ BatchMax 600kg/8 hour100-150kg/ BatchMax 900kg/8 hour200-300kg/ BatchMax 1800kg/8 hour300-500kg/ BatchMax 3000kg/ 8 hourApplicable hospitalbeds50-100Beds100-200Beds150-250 Beds200-300 Beds300-600 Beds700-1000BedsDimension (L×B×H)(m)1.45×0.9×2.381.8×1.15×31.86×1.4×3.22×1.4×3.52.2×1.4×3.83×2×4.8Input port size(mm)480x600620X800700x900760×960900×11001080×1280Main Chamber Inner dimensions(mm)1250*600*6001300*750*7001400*800*9001700*900*10001850*1000*11002400*1470*1400Fan power0.37kw0.37kw0.5kw0.5kw1.1kw1.1kw +0.55kwCombustion burner(Oil burner)Power 0.11kwFuel consumption4-6 kg/hPower 0.11kwFuel consumption4-10 kg / hPower 0.11kwFuel consumption4-10 kg/ hPower 0.11kwFuel consumption4-10 kg/ hPower 0.22kwFuel consumption7-14 kg/ hPower 0.22kwFuel consumption7-14 kg/ hSecondary combustion burner(Oil burner )Power 0.11kwFuel consumption6-10 kg/ hPower 0.11kwFuel consumption8-14 kg/ hPower 0.11kwFuel consumption10-12 kg/ hPower 0.22kwFuel consumption10-18 kg/ hPower 0.37kwFuel consumption10-20kg/ hPower 0.37kwFuel consumption15-26 kg/ hVoltage380Vor 220Vor as client's requirementWeight(kg)3000460068007600900013800Container Loading of Waste IncineratorApplication:1).Infectious medical waste.2).Animal carcass/ dead body, poultry leather, etc.3).Daily/domestic garbage/ rubbish.4). Package waste.5). Disposable plastic waste, like bottle, cup, bowl, tray.6). Other solid waste.Our CertificationsWebsite of Shandong Gaogong Enviro-Tech Co., Ltdwww.gaogonghb.com
举报收藏 0
>本企业其它产品
Gaogong Group Quick Installation Light Steel Structure Workshop Warehouse Gaogong Group Structure Steel Fabrication Workshop Warehouse Steel Frame Building Gaogong Group Industrial Steel Structure Series Building Workshop Warehouse Gaogong Group Fast Construction Prefabricated Factory Steel Structure Warehouse Gaogong Group Low Cost Prefab Steel Structure Warehouse Workshop Office Gaogong Group Prefabricated Building Steel Structure House Industrial Workshop Warehouse Gaogong Group Light Steel Structure Prefabricated Warehouse for Workshop Building Gaogong Group Steel Roof Structure Workshop  Steel Building  Ethiopia