Biogas-Nature Gas Conversion Plant Upgrading/Decarburization/Purification System

 
 
单价 10.00 / Piece对比
销量 暂无
浏览 213
发货 Chinahunanchangsha
库存 100Piece
过期 长期有效
更新 2020-09-06 11:32
 
联系方式
加关注0

Hunan Along New Energy Technologies Co., Ltd.

企业会员第5年
资料未认证
保证金未缴纳
详细说明
Product Name: Biogas-Nature Gas Conversion Plant Upgrading/Decarburization/Purification System Model NO.: ALONG CH4 Content: 97% CNG Pressure: 20MPa for Gas Station CO2 Content: 3% Digester Capacity: 2*5, 000 Cubic Meters Cstr Ng Production: 10, 000 Nm3/Day Trademark: ALONG BIOGAS Transport Package: LCL or FCL Specification: Complete System Origin: China HS Code: 8486909000 Product Description After two-stage desulphurization processes, then go through our GasDec system for carbon removal, biogas could be upgraded to make CNG, for vehicle or going into national pipeline network.The gas quality after upgrading as below:ItemQuality IndexCommentsHigh thermalvalue MJ/m3>31.4In the specific geographical area for vehicle driving, under the highest operation pressure, the water dew point shouldn't be higher than -13 degree.C; When lowest ambient temperature lower than -8 degree.C, the water dew point should be 5 degree.C lower than the lowest temperature.CO2%≤3.0Total Sulfurmg/Nm3≤200H2Smg/Nm3≤15O2%≤0.5Comments: The above data is subject to clients' actual requirements.The Flowchart of biogas upgrading systemProcedures of our biogas upgrading system1, Biogas GenerationBiogas is generated in anaerobic reactor and stored in gas holder in low pressure. Boosted by biogas blower, biogas is delivered to wet desulphurization tower;2, Wet DesulphurizationWet chemical desulphurization technology is mainly structured as a single tower. Chemicals adopted is Na2CO3with addition of catalysts (oxygen carrier). Chemicals is dissolved in the water, contact rightabout with biogas in the tower. More than 95% hydrogen sulfide, a small amount of carbon dioxide and other acidic substances can be absorbed by the liquid.The pregnant solution (the liquid) would be boosted by pump to a special groove, sprayed and oxidized by means of air suction for regeneration. Meanwhile elemental sulfur is precipitated out of the liquid, to be recycled for sale.3, Dry DesulphurizationDry chemical desulphurization technology is for the purpose of fine desulphurization, mainly structured as double towers, can be used alternately or operated in parallel or in series. Chemicals adopted is usually ferric oxide. Hydrogen Sulfide is converted to solid sulfide.4, Gas CleaningThe gas is boosted by biogas compressor, then after procedures of cooling, water and impurities removal, to be delivered to decarburization unit.5, Biogas DecarburizationThe decarburization technology we adopt is chemical absorption. Chemical solution contacts with biogas rightabout in the absorption tower, to absorb carbon dioxide till its content lower than 3%.The upgraded gas is discharged from top of absorption tower, to be cooled by cooler and cleaned by separator for the removal of condensate water and chemical solution. Then gas is delivered to compressor.The pregnant solution (the liquid) returns to the regeneration tower. The precipitation of carbon dioxide is achieved through steam stripping. The precipitated carbon dioxide gets through cooler and separator, can be discharged into atmosphere directly. The barren solution from the bottom of regeneration tower is pumped through automatic flow monitoring pipeline into absorption tower for circulatory use.This is our GasDec system.1, NG CompressorThe gas after decarburization procedure we can call it natural gas now. Its pressure rises to 22MPa or other pressure levels by natural gas compressor.2, NG CleaningThe compressed natural gas would be dried and cleaned further by automatic NG drier. The working principle of drier is pressure swing absorption, taking 4A molecular sieve as absorbent.3, CNG MeteringCNG metering device is required when gas is for sale. Measuring method we usually adopt mass measurement. Eg. The mass flowmeter of our project in Henan Province of China is Emerson CNG050, accuracy could reach 0.5 magnitude. Gas is filled into CNG tank lorry through gas dispenser machine, to be delivered to standard CNG station (or Primary CNG station) as fuel for vehicle.Main equipment list of our upgrading systemNo.ItemCommentsBiogas Desulphurization System1Wet Desulphurization Tower2Groove,Pregnant Solution3Groove,Barren Solution4 Groove,regeneration5Separator6Dry Desulphurization Tower7Regeneration Pump8Pump,Desulphurization9Pump,Sulfur Foam10Biogas Blower11Electrical Monitoring12Alarming SystemBiogas Decarburization System1Pump,barren Solution2Decarburization TowerMethane Recovery: ≥99%,Gas quality satisfies GB18047-2000 standard3On-line Analyzer4On-site control box5PLCSystem6Operator Station7On-line UPS8Automatic flowmeter9Motorized Valve10Pressure Transmitter11On-site Pressure Gauge12On-site Temperature Gauge13Liquid level Gauge14Frequency Converter15Filter16Storage Tank17Underground Groove18Underwater Pump19Biogas Compressor20Power Distribution CabinetAssembling UnitCNG Compressing, drying and metering Unit1CNG Compressor2Dryer3Gas Dispenser MachineCirculatory Cooling Water Unit1Circulatory water system
举报收藏 0
更多>本企业其它产品
Skid Mounted Comprehensive Biogas Pre-Treatment Desulfurization System Before Generator Container Silent 25-450kw Biogas Generator Set CHP Unit Biogas/Landfill Gas Dehumidification Dryer Chiller Pressure Stabilize System Anaerobic Lagoon Digester Biogas Plant by HDPE Geomembrane for a Starch Plant Biogas Upgrading/Decarburization/Purification System to Natural Gas/CNG 2*10000cbm Enamel Steel Digester Landfill Biogas Dryer Dewater System Dehumidification De-Moisture System Transportable Biogas Generator Set CHP System with Container
网站首页  |  关于我们  |  联系方式  |  用户协议  |  隐私政策  |  版权声明  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报