Biogas Decarburization De-Carbon Upgrading/Purification/CNG/Biomethane/Bio-Natural Gas Production

 
 
单价 10.00 / Piece对比
销量 暂无
浏览 126
发货 Chinahunanchangsha
库存 100Piece
过期 长期有效
更新 2020-09-06 11:31
 
联系方式
加关注0

Hunan Along New Energy Technologies Co., Ltd.

企业会员第5年
资料未认证
保证金未缴纳
详细说明
Product Name: Biogas Decarburization De-Carbon Upgrading/Purification/CNG/Biomethane/Bio-Natural Gas Production Model NO.: ALONG-BIOGAS-MS Decarburization Technology: Membrane Separation Methane/CH4 Target Value: 95~99% as Required CNG Pressure Output: 20MPa or Other as Required Treatment Capacity: 50~5000 Nm3/Hr Trademark: ALONG BIOGAS Transport Package: Original Packing Specification: Complete System Origin: China HS Code: 8486909000 Product Description After two-stage desulphurization processes, then go through our GasDec system (Membrane Separation) for carbon removal, biogas could be upgraded to make CNG, for vehicle or going into national pipeline network.The gas quality after upgrading as below:ItemQuality IndexCommentsHigh thermal valueMJ/m3>31.4In the specific geographical area for vehicle driving, under the highest operation pressure, the water dew point shouldn't be higher than -13 degree.C; When lowest ambient temperature lower than -8 degree.C, the water dew point should be 5 degree.C lower than the lowest temperature.CO2%≤3.0Total Sulfurmg/Nm3≤200H2Smg/Nm3≤15O2%≤0.5Comments: The above data is subject to clients' actual requirements.Procedures of our biogas upgrading system:1, Primary FilterThe saturated water and partial particles in the raw digester gas are removed through the primary filter;2,Boosting, Primary desulphurizationThe biogas from primary filter is boosted by blower. Then after cooling, the biogas is fed to wet type desulphurization system for primary removal of Hydrogen Sulfide, to make H2S content lower than 200 mg/Nm3;3, Fine desulphurizationThe content of Hydrogen Sulfide is made lower than 50 mg/Nm3through dry type desulphurization system;4, Impurities Removal, Fine Cleaning SystemThe new dust and impurities in biogas could be removed through the Separator; Then delivered to Fine cleaning system for removals of water and tiny particles in order to protect membrane and guarantee its life-time;5. First MS (Membrane Separation)The high quality compressed biogas goes into the first MS system through gas-distributing pipeline. The exhaust gas could be gathered or discharged into atmosphere;6. Secondary MS (Membrane Separation)The gas out of First-MS goes into Secondary MS system for final decarburization. The exhaust gas would totally return to the inlet of biogas compressor. Thiophane is added into the cleaned gas, after CNG compressor, through dispenser, to be delivered to gas station by tank lorry;Main equipment list of our upgrading system:1. Main non-standard equipmentItemEquipment NameSpecificationsQtyComments1Primary Filter1Unit2Primary Cooler1Unit3Wet Desulphurization Tower1Unit4Secondary Filter1Unit5Dry Desulphurization Tower1Unit6Separator1Unit7Pregnant Groove1Unit8Regeneration Groove1Unit9Barren Liquor Groove1Unit10Sulfur Froth Groove1Unit11Underground Groove1Unit12Fine Cleaning System1Set13First MS Assembly1 Batchimported14Second MS Assembly1 Batchimported15Buffer Tank1Unit2. Main Operation Equipment ListItemEquipment NameMaterialQTYComments1Biogas BlowerCase Iron2 UnitsWith back-upAnti-explosion2Desulphurization PumpCase Iron+SS3042UnitsWith back-upAnti-explosion3Regeneration PumpCase Iron+SS3042UnitsWith back-upAnti-explosion4Sulfur Froth PumpCase Iron+SS3042UnitsWith back-upAnti-explosion5Supplement PumpCase Iron+SS3041UnitAnti-explosion6Biogas CompressorCase Iron1UnitAnti-explosion, Variable frequency7CNGCompressorCase Iron1UnitAnti-explosion, Variable frequency8Gas Dispenser1UnitSingle line, Double nozzles & measuring9Gas Odorization1Unit3. Instruments & controllingItemProduct NameQTYComments1PLCControlling Cabinet1set2PLCsystem1set3Operator Station2units4Complete On-line UPS1unit5Flow-meter2units6On-line analyzer2units7Pressure transmitter1 batch8Pressure gauge1 batch9Temperature gauge1 batch10RTD1 batch11alertor1 batch12Electrical control box1 batch
举报收藏 0
更多>本企业其它产品
Skid Mounted Comprehensive Biogas Pre-Treatment Desulfurization System Before Generator Container Silent 25-450kw Biogas Generator Set CHP Unit Biogas/Landfill Gas Dehumidification Dryer Chiller Pressure Stabilize System Anaerobic Lagoon Digester Biogas Plant by HDPE Geomembrane for a Starch Plant Biogas Upgrading/Decarburization/Purification System to Natural Gas/CNG 2*10000cbm Enamel Steel Digester Landfill Biogas Dryer Dewater System Dehumidification De-Moisture System Transportable Biogas Generator Set CHP System with Container
网站首页  |  关于我们  |  联系方式  |  用户协议  |  隐私政策  |  版权声明  |  网站地图  |  排名推广  |  广告服务  |  积分换礼  |  网站留言  |  RSS订阅  |  违规举报